Xe Máy Độ-Xe Máy Độc: dom tubing

Sad bars....

C2 was long overdue for some new bars.

Holesaw to the tubing.
Lathe to the rod (overdid the length but...you live and learn).
Handlebars+1
 Time to drill out and tap.
Needed to make a tool to hold the tap in place.
Handlebars+2
 Moyou was not impressed.
Handlebars+3
Drill it out.
Handlebars+4
 Tap that bung.
Handlebars+5
 This is a Hutch shot.
Moyou with the creeep.
Handlebars+6
 Pre-bent mocked up bars.
Gross.
Handlebars+7
 Kyle came through with the late night bend.
I appreciate it!
Handlebars+8
 Time to weld.
I am horrible at welding....
Handlebars+9
Moyou was even less impressed with this.
Handlebars+10
This is before the welds got cleaned up and filled in.
I also took a few inches off the overall wingspan.
Handlebars+12
 Early mock up.
Hopefully I will be able to get these powdercoated next week.
All the aluminum switch housings are going to get zapped black soon too.
handlebars+11
Next up:
Make new sissy bar mounts and bar.

Padlocks and steel

A few locks arrived in the mail today.

Miller elephant lock.
Slightly larger than the one I have.
I think there were 3 sizes....
Miller+elephant+lock

Crusader.
Looks pickable....
Crusader+lock

Goliath 8 lever with key...
Not Eagle Lock Co.....
Goliath+lock

Corbin lock, newer.
Corbin+lock

Kangaroo lock. 
This thing is super skinny....
Kangaroo+lock

 Electric start delete caps, Shadow handlebars, seat mounts, sissy bars...
They all look like this at one point in their lives......
Moyou approved.
Tubing+and+rod