Xe Máy Độ-Xe Máy Độc: Cleaning

Re-build Set-up.

Preparation.
Maybe santa will stop by tomorrow and help me finish up.

Cam chain went swimming earlier.
Ready for cylinders.
 If there is an arrow on the piston, point it toward the exhaust.
If there is IN stamped on it, well then that faces the intake.
 90パーセント準備だな。
Perfect song for an X-mas eve alone.

Winter.....whatever.

Just in time.
All organizing supervised by Moyou.

Stripped and left for dead.
Moyou was using the spice.
Dune.
 This is about as chopper gold as it gets around here.
 CB160 swingarm Vs. CL175 Swingarm.
Brass bushings.................Plastic bushings
18 inches...........Length...........18.5 inches

CB175 has axle run extends .5 inches farther back.
Shock mounts are the same distance out. 
(Same as a cb77 also)
Conclusion:
Get better bushings for the CL175 swingarm.
 Just in time.
Come on 2 hour delay.....



Saturday Searching.

Staying home for a change.

Pampered myself with pancakes.
 Had a lot of this going one.
Dirty...................................................................Clean
Gasket surface cleaning.

 What up stinka.
My crankshaft and clutch mechanism spring are not your playground.
 Memory game with motorcycles
Moyou inspection.
Reinstall ready?
 Nah. 
I have time.
Rust soak spokes.